Parliamentary Delegation Inspection of Abda Sanat Barq Co. Facilities

Evaluation and attainment of Level-A Innovative Knowledge-Based status for Abda Sanat Barq Co. by the Vice Presidency for Science, Technology and Knowledge-Based Economy

Leveraging the technical expertise of its experienced Research and Development (R&D) team, Abda Sanat Barq Co. successfully engineered and manufactured the country's first two-story (double-decker) substation.

پست دو طبقه در کشور
Visit of the Esteemed Vice Presidency for Engineering and Supervision of Mashhad Electric Energy Distribution Company to the Production Lines and Innovations of the Knowledge-Based Company Abda Sanat Barq

Educational Visit of Engineers and Experts from the Engineering and Supervision Office of Mashhad Electric Energy Distribution Company to the Abda Sanat Barq Manufacturing Facility

Hosting the Training Course on Automation, Grid Integration, and Equipment Smartification

Conducting final inspection and routine testing of three 2500 kVA oil-immersed transformers in the presence of the client, technical representatives from the consulting engineering firm, and the supervisory body to perform Factory Acceptance Testing (FAT) and deliver the final products.
IMG 20260623 022723 221 360x320
IMG 20260623 022722 844 360x320

Visit of Representatives and Staff from Mashhad Electric Energy Distribution Company (MEEDC) to Abda Sanat Barq's Manufacturing Lines

Commissioning of the 12 MVA Auto-Booster (Voltage Regulator) in East Azerbaijan Province

بهره برداری از اتوبوستر 12MVA استان آذربایجان شرقی
بهره برداری از اتوبوستر 12MVA استان آذربایجان شرقی
بهره برداری از اتوبوستر 12MVA استان آذربایجان شرقی
بهره برداری از اتوبوستر 12MVA استان آذربایجان شرقی
Visit of Engineering and Operations Experts from Kurdistan Province Electric Power Distribution Company to the Production Lines and Innovations of the Knowledge-Based Company Abda Sanat Barq
Execution of Factory Acceptance Testing (FAT) for the First Manufactured Electric Motors (710 kW) Under International License by the Knowledge-Based Company Abda Sanat Barq, Conducted in the Presence of the Client's Supervisory Body
IMG 3725 768x1024
Installation and Commissioning of the Fully Automated Semi-GIS Ring-Main Pad-Mounted Substation for Guilan Province Electricity Distribution Company
پست پدمانتد رینگی نیمه گازی فول اتوماسیون
پست پدمانتد رینگی نیمه گازی فول اتوماسیون
پست پدمانتد رینگی نیمه گازی فول اتوماسیون
پست پدمانتد رینگی نیمه گازی فول اتوماسیون

Execution of Type and Routine Tests for a 7 MVA Mining Project Transformer in the Presence of Niroo Research Institute (NRI) Representative — Summer 2025 | Client: Foreign Mining Enterprise (Kazakhstan)

Execution of Routine Testing for a 6 MVA Mining Duty Transformer in the Presence of the Client’s Supervisory Representative — Winter 2026 | Client: Khaf Mine / Sanat Karan Co.