The Installation and Commissioning Department at Abda Sanat Barq Co., backed by an experienced and certified technical team, is responsible for the precise, safe, and standardized deployment of equipment across project sites. Adhering strictly to technical instructions and execution standards, this department manages the installation process to ensure all systems operate under peak conditions for sustainable long-term performance. The on-site presence of technical specialists and their rigorous oversight throughout every implementation phase play a vital role in minimizing potential errors and extending equipment lifespan.
During the commissioning phase, the company’s specialized team verifies proper and synchronized equipment operation through final testing, standardized startup, and precise calibration. This process encompasses operational parameter checks, operator training, and the provision of necessary guidelines to the client, ensuring the system enters service with maximum efficiency and safety. The team’s extensive field experience across diverse projects ensures low-risk, high-quality equipment commissioning.
Alongside these services, the After-Sales Service Department at Abda Sanat Barq Co. delivers continuous technical support through a responsive, customer-centric approach. By offering periodic inspections, routine maintenance and servicing, genuine spare parts supply, and rapid response to client inquiries, this unit ensures the long-term, uninterrupted operation and stability of deployed equipment.
A commitment to quality, rapid service delivery, and ongoing client communication define the core principles of the company’s After-Sales Service Department. Recognizing the critical importance of technical support in industrial projects, Abda Sanat Barq Co. maintains a steadfast presence alongside its clients, delivering professional services that ensure long-term reliability and complete customer satisfaction.
Installation and Commissioning of the Fully Automated Semi-GIS Ring-Main Pad-Mounted Substation for Guilan Province Electricity Distribution Company
Dispatch of Two 2500 kVA Transformers along with 20 Transformer Wheels